Deerpark Warehouse, Oranmore

Client: Tom Considine

Consultants: Westcon Engineers – Engineer

Value: €0.75m

 

Project Description:

Construction of over 10,500 square feet warehouse facility with ceiling height of over 11 metres with provision for extra floors to be built to suit clients needs. The warehouse facility can be sub-divided into two separate units as separate electrical metres and toilet facilities were added at each end of the warehouse. Provision for a dock leveller was also included.

Back